PROJECT PORTFOLIO

Real projects, real results. Every job completed safely with zero utility strikes.

500+
Jobs Completed
0
Utility Strikes
20+
Cities Served
100%
On-Time Rate

Featured Project

Colorado Springs Utility Corridor
PotholingMunicipalLarge Scale

Colorado Springs Utility Corridor

1,200 pothole locations along a 4-mile utility corridor for Colorado Springs Utilities. Zero utility damage on a complex multi-utility environment.

Colorado SpringsNov 202414 days
Colorado Springs Utility Corridor
Potholing

Colorado Springs Utility Corridor

1,200 pothole locations along a 4-mile utility corridor for Colorado Springs Utilities. Zero utility damage on a complex multi-utility environment.

Colorado Springs14 days
Emergency Pipeline Repair
Emergency

Emergency Pipeline Repair

24-hour emergency response to ruptured gas main in residential area. Crew mobilized in 90 minutes, excavation completed in 6 hours, zero secondary incidents.

Pueblo6 hours
Winter Mountain Excavation
Cold Weather

Winter Mountain Excavation

Water main repair at 9,200 ft elevation in January. Excavated through 3 ft of frozen ground at -15°F using 400,000 BTU heated water system.

Woodland Park3 days
Fiber Optic Slot Trenching
Slot Trenching

Fiber Optic Slot Trenching

18 miles of slot trenching for fiber optic installation across 3 municipalities. Completed 2 days ahead of schedule with zero utility conflicts.

Castle Rock8 days
Industrial Tank Cleanout
Industrial

Industrial Tank Cleanout

Complete cleanout of three 50,000-gallon industrial storage tanks. Removed 180 tons of accumulated sediment and debris.

Pueblo West2 days
Denver Metro Utility Daylighting
Potholing

Denver Metro Utility Daylighting

450 utility daylighting locations for major commercial development. Identified and documented 6 previously unmapped utility lines.

Denver5 days
Highway Utility Relocation
Hydrovac

Highway Utility Relocation

Utility relocation for CDOT highway expansion project. Excavated 2,400 linear feet of utility corridor with zero traffic incidents.

Monument10 days
Telecom Infrastructure
Slot Trenching

Telecom Infrastructure

Slot trenching for 5G tower installation across 12 locations. Coordinated with 4 utility companies for safe excavation near critical infrastructure.

Fort Collins6 days
Water District Emergency
Emergency

Water District Emergency

Emergency water main break repair serving 3,000 homes. Responded in under 45 minutes, restored water service within 8 hours.

Fountain8 hours