Our Work
PROJECT PORTFOLIO
Real projects, real results. Every job completed safely with zero utility strikes.
Featured Project
Colorado Springs Utility Corridor
1,200 pothole locations along a 4-mile utility corridor for Colorado Springs Utilities. Zero utility damage on a complex multi-utility environment.
Colorado Springs Utility Corridor
1,200 pothole locations along a 4-mile utility corridor for Colorado Springs Utilities. Zero utility damage on a complex multi-utility environment.
Emergency Pipeline Repair
24-hour emergency response to ruptured gas main in residential area. Crew mobilized in 90 minutes, excavation completed in 6 hours, zero secondary incidents.
Winter Mountain Excavation
Water main repair at 9,200 ft elevation in January. Excavated through 3 ft of frozen ground at -15°F using 400,000 BTU heated water system.
Fiber Optic Slot Trenching
18 miles of slot trenching for fiber optic installation across 3 municipalities. Completed 2 days ahead of schedule with zero utility conflicts.
Industrial Tank Cleanout
Complete cleanout of three 50,000-gallon industrial storage tanks. Removed 180 tons of accumulated sediment and debris.
Denver Metro Utility Daylighting
450 utility daylighting locations for major commercial development. Identified and documented 6 previously unmapped utility lines.
Highway Utility Relocation
Utility relocation for CDOT highway expansion project. Excavated 2,400 linear feet of utility corridor with zero traffic incidents.
Telecom Infrastructure
Slot trenching for 5G tower installation across 12 locations. Coordinated with 4 utility companies for safe excavation near critical infrastructure.
Water District Emergency
Emergency water main break repair serving 3,000 homes. Responded in under 45 minutes, restored water service within 8 hours.
